LIBRARY AND INFORMATION CENTRE

UNIVERSITY OF AGRICULTURAL SCIENCES

Progress report for 1994-95 and Technical programme for 1995-96 : UASB / Operational Research Project. Textual Documents Operational research Project, Kalyanakere-Mavathurkere Watershed In Karnataka

By: Operational Research ProjectContributor(s): Operational Research Project | Kalyanakere-Mavathurkere Watershed In KarnatakaLanguage: English Original language: Publisher: Bangalore : University of Agricultural Science, 1996Description: 74 p. : 24 cm. tablesSubject(s): Mango | Agro forestry trial | Crop and cropping systems | Mavathurkere WatershedDDC classification: 631.706
Incomplete contents:
Introduction -- Rain rall -- Studies on soil and moisture conservation measures -- Studies on evaluation of local grasses -- Studies on effect of tillage on soil moisture regime -- Eggect of organic mulches in mango garden -- Time of sowing.
Tags from this library: No tags from this library for this title. Log in to add tags.
    Average rating: 0.0 (0 votes)
Item type Current location Call number Status Notes Date due Barcode
UASB Reports UASB Reports GKVK Library
631.706 UAS(B) (Browse shelf) Not for loan Digitized R-11045

Introduction -- Rain rall -- Studies on soil and moisture conservation measures -- Studies on evaluation of local grasses -- Studies on effect of tillage on soil moisture regime -- Eggect of organic mulches in mango garden -- Time of sowing.

There are no comments on this title.

to post a comment.

Hosted by GKVK Library | Powered by Koha